About RPEWest

RPEWest serves as the bridge between AI data center developers and local utilities to unlock verifiable grid capacity through customer-funded Non-Wires Alternatives (NWAs).

500+

installations completed

10+

MW installed capacity

1000+

of tons of CO₂ reduced annually

60%

Average client savings on bills

Our Vision

Vision: To become the leading provider of grid-capacity solutions for hyperscale AI infrastructure across the United States, proving that the smartest way to power the future is by making the existing grid dramatically more efficient — one verified megawatt at a time.

Our Customers

From consultation to activation, every project is handled with technical precision and customer-focused service.

Data Center Developers

Hyperscaler: Faster, lower-cost interconnection

Local Businesses

Most companies don’t realize they’re being penalized until they see the line item. The result: higher electricity bills (5–20%+),

Utilities

Utility: Deferred capex, meets conservation targets, and a grid that’s stretched thinner every year.

Regulator: Clean-energy progress with no new wires

Clean energy with no new wires

High Power Users (50-100kW)

Manufacturing plants, food processors, cold storage facilities, hospitals, warehouses, and especially the exploding data-center sector run inductive loads that drop power factor below 0.90–0.95

Our Mission

Our mission: To accelerate AI data center deployment in energy-constrained regions by unlocking hidden grid capacity through patented efficiency technology — delivering faster builds, lower costs, and stronger local economies.

Meet the Team

Bill Quigg

CEO & President

Renewable energy engineer with 12+ years of experience in solar system and grid integration.

Rick Moore

Vice President

Oversees installation timelines, permits, and quality control across all projects.

New Employee

Lead Installation Engineer

Specializes in system optimization and performance diagnostics, and guides clients.

Proven Results

Real projects. Real savings. Real impact.

28% Bill reduction at Commvault Data Center after deploying OmniPower™

Commvault

16 MW Capacity Relief provided to Con Edison substation network

Con Edison

2,847 Facilities using OmniPower™ for grid capacity release.

National Grid

Ready to scale your next Data Center project?

Schedule a confidential capacity assessment for your target site. First evaluation is free.

Official Licensee of OmniPower™
Contact

Info@RPEWest.com

(800) 123 456

Scottsdale, AZ

Navigation

Home

About Us

Services

Request Consultation

© 2026 RPEWest. All rights reserved.